Field Report
Field Report

Why ringlock beat tube-and-coupler on a 42-storey façade

On a tight city plot, the erection crew had 11 days per cycle. Switching from couplers to ringlock cut that to six — and removed the loose-fitting risk that had been flagging on every inspection. Here's the full breakdown.

Read the story
Latest

Recent articles

Field Report
Jun 18, 2026 · 6 min

Reading a rosette: the geometry that makes ringlock fast

Eight connection points at fixed angles sound simple — here's why that single decision removes most erection errors.

Read more →
Cost
May 29, 2026 · 5 min

Galvanising vs painting: a 20-year cost comparison

We modelled total cost of ownership across three climate zones. The galvanised system wins in year four.

Read more →
Engineering
May 07, 2026 · 8 min

Shoring take-offs: how we size a slab support

A walk through a real 600 mm slab support, from concrete loads to the standard layout we delivered.

Read more →
Safety
Apr 22, 2026 · 4 min

Event scaffolding: a grandstand safety checklist

Crowd load is live load. The checks our crew runs before a single spectator arrives.

Read more →
Logistics
Apr 03, 2026 · 3 min

Shipping a 40-foot container: what actually fits

Roughly 26 tonnes of ringlock per container — and why mixed kits pack better than single parts.

Read more →
Training
Mar 19, 2026 · 5 min

The first hour on a ringlock site

What we teach supervisors before the crane lifts the first standard. Most of it is habit, not theory.

Read more →